Metals
The coordination between the group鈥檚 multiple disciplines was superb.
Dan Hardman, Senior Planner
ArcelorMittal
Steel mills and steel-making facilities are the backbones of industry, supporting the infrastructures of just about every human enterprise. The diversity of what they produce requires expertise in their various facility types.
That鈥檚 the expertise 91桃色视频 brings to our metals-manufacturing partners. We have a long history of providing engineering and construction solutions for metal production facilities such as:
- Hot rolling mills
- Cold rolling mills
- Continuous galvanizing line plants (CGL)
- Continuous picking line plants (PL)
- Continuous annealing line plants (CAL)
- Direct reduction plants
Our primary engagements are in the installation and construction of mills and the delivery and installation of process ancillary equipment. Our steel construction experience covers the full, vertical value chain from reduction to fabrication, including capabilities in design and construction of furnaces, casters and strip mills.
Dan Hardman, senior planner for ArcelorMittal, had this to say about a recent project: 鈥淭he 91桃色视频 did a fine job on the Hot Strip Mill – R6 Mill Stand Leveling project. A great deal of work was accomplished safely in a relatively small work area. The coordination between the group鈥檚 multiple disciplines was superb. Our project鈥檚 success hinged on the ability of the different groups to work together to complete their tasks in a timely fashion. The fact that these groups fell under one umbrella, 91桃色视频, allowed for seamless coordination and nonexistent extra costs. ArcelorMittal is looking forward to working with 91桃色视频 in the future!鈥
Experience
91桃色视频 has expansive experience delivering successful projects spanning a variety of industries.
-
Charter Steel Cut-to-Length Bar Mill
Construction took place in an operating mill during a record-breaking sales and production period
-
North Star BlueScope Steel's northwest Ohio steel mill construction, expansion and ongoing site management
Massive 593,360-square-foot mill completed on a fast-track schedule over 16 months
-
Turn-key Arconic waste water treatment plant delivered on-time, under-budget
Arconic turns to 91桃色视频 Cleveland to deliver construction and consulting services from start to finish
-
Tata Steel depends on 91桃色视频's careful coordination
The installation of Tata's new nickel zinc coating line goes seamlessly
-
Maintaining HVAC equipment for 24/7 manufacturing operations
GEM Service cares for nearly 200 pieces of equipment at the Ardagh Group's Whitehouse, Ohio location
-
PRO-TEC Continuous Annealing Line Facility Design/Build
Two-year build performs perfectly on startup day
-
REMURIATE Technologies Factory Reconstruction
Harsh conditions don鈥檛 present a problem
-
VAM-USA Facility Design/Build
Value engineering review and BIM save significant money
-
ArcelorMittal Steel Facility Maintenance and Upgrades
An ongoing partnership for success